notesum.ai

Published at November 27

Flow Shop Scheduling with Inter-Stage Flexibility and Blocking Constraints

math.OC
cs.DM
90B35 (Primary) 90C59, 65Y20 (Secondary)
G.2.3; F.2.2

Released Date: November 27, 2024

Authors: Gaia Nicosia, Andrea Pacifici, Ulrich Pferschy, Anna Russo Russo, Cecilia Salvatore

Arxiv: http://arxiv.org/abs/2411.18381v1