notesum.ai
Published at November 27Flow Shop Scheduling with Inter-Stage Flexibility and Blocking Constraints
math.OC
cs.DM
90B35 (Primary) 90C59, 65Y20 (Secondary)
G.2.3; F.2.2
Released Date: November 27, 2024
Authors: Gaia Nicosia, Andrea Pacifici, Ulrich Pferschy, Anna Russo Russo, Cecilia Salvatore

| Single-start | Multi-start | |||
|---|---|---|---|---|
| Time | Obj. | Total time | Best Obj. | |
| 5 | 0.01 | 408.7 | 0.29 | 404.5 |
| 10 | 0.03 | 674.7 | 1.73 | 666.2 |
| 15 | 0.08 | 995.7 | 4.87 | 984.1 |
| 20 | 0.18 | 1237.6 | 11.76 | 1224.0 |
| 25 | 0.36 | 1596.4 | 22.41 | 1578.4 |